There are two Municipal Drinking Water Systems in the Township of Otonabee-South Monaghan: Elgeti-Crystal Springs in Stewart Hall and Keene Heights in Keene. The Township owns the water systems and the Ontario Clean Water Agency (OCWA) operates them.
There is a total of 144 service connections for the water systems in OSM. There are 107 service connections in the Elgeti-Crystal Springs system and 37 service connections in the Keene Heights system.
To pay for the operating and ongoing maintenance and capital costs, the water users pay a flat annual water rate that is included in their tax bill. The Township has installed water meters and metered water rates may be considered in the future.
Residents in Burnham Meadows have a water system maintained and owned by the Peterborough Utilities Group. For more information, contact them by phone at 705-748-9300.
For residents on the Elgeti Crystal Springs or Keene Heights water system, if you have concerns about your water (e.g. low pressure, no water, etc.), please call:
Ontario Clean Water Agency
Phone (weekdays 8:30 a.m. - 5:00 p.m.): 705-653-1870
Phone (after hours): 1-800-342-6442 or 1-613-342-0521
When calling OCWA, you need to ask them to page the On Call Operator.
For residents on the Burnham Meadows water system, if you have concerns about your water, please contact:
Peterborough Utilities Group
Phone (24 hours): 705-748-9300
Source Water Protection is mandatory under the Clean Water Act. The Township is part of the Otonabee-Peterborough Source Protection Authority, which is part of the Trent Conservation Coalition Source Protection Region.
A Source Protection Plan has been approved by the Ministry of Environment. For more information, please visit the Source Water Protection page.
July 2018 Peterborough Public Health Keene Heights Sodium Level Notice
Year | Schedule 22 | Section 11 |
2020 |
Schedule 22 | |
2018 |
Schedule 22 | |
2017 | Schedule 22 | Section 11 |
2016 | Schedule 22 | Section 11 |
2015 | Schedule 22 | Section 11 |
2014 | Schedule 22 | Section 11 |
2013 | Schedule 22 | Section 11 |
2012 | Schedule 22 | Section 11 |
2011 | Schedule 22 | Section 11 |
2010 | Schedule 22 | Section 11 |
2009 | Schedule 22 | Section 11 |
Year | Schedule 22 | Section 11 |
2020 | Schedule 22 | |
2018 | Schedule 22 | |
2017 | Schedule 22 | Section 11 |
2016 | Schedule 22 | Section 11 |
2015 | Schedule 22 | Section 11 |
2014 | Schedule 22 | Section 11 |
2013 | Schedule 22 | Section 11 |
2012 | Schedule 22 | Section 11 |
2011 | Schedule 22 | Section 11 |
2010 | Schedule 22 | Section 11 |
2009 | Schedule 22 | Section 11 |
Year | Report |
2017 | 1-CNB8R |
2016 | |
2015 | 1-C0W2 |
2014 | 1-BDMEW |
2013 | 1-AOGX5 |
Thank you to Infrastructure Canada/Green Infrastucture for funding in part
upgrades to the Keene Heights and Elgeti/Crystal Springs SCADA Systems and
energy efficiency upgrades to the Keene Heights and Crystal Springs/Elgeti WTP's
Clean Water Wastewater Funding Announcement July 7, 2017